Class 2 - Residential
High-Rise Residential Towers
Approvals typically in ~35 days
"Council told us our project was non-complying and we would need a DA - an 18-month process. Our certifier approved it as CDC in 12 days."
In NSW, you cannot legally begin construction on a new home without either a CDC or a CC - and every day waiting costs you in finance and holding charges.
Eligibility Check
Select all that apply to your project.
You missed a few requirements.
Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:
Don't worry, we've got you.
Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.
Call 0421 936 489Typical Class 1a CDC or CC issued in 10–14 business days.
Day 1
Upload your architectural drawings, site plan, BASIX certificate, and soil report.
Days 1–5
We check energy compliance, setbacks, height limits, and fire safety requirements.
Days 5–10
Minor conditions resolved quickly - we contact you directly, not via council.
Day 10–14
CDC or CC signed. Your builder can mobilise and begin excavation immediately.
During Build
We attend pre-slab, frame, waterproofing, and insulation stages on one schedule.
Completion
Final on-site inspection. OC issued. You can legally occupy your new home.
Have a question about the process? Call us - we're happy to walk you through it.
Scope of Works
Expert guidance and fast approvals to get your residential project out of the ground sooner.
Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Architectural Drawings
Floor plans, elevations, sections - from your architect or draftsperson
Site / Survey Plan
From your licensed surveyor - showing boundaries and levels
BASIX Certificate
Energy efficiency certificate - mandatory for all NSW homes
Soil Investigation Report
Geotechnical report for footing design
Structural Engineering Report
Certified by a practising engineer
Hydraulic / Drainage Plan
Stormwater management design
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Single Dwellings & New Homes we've certified

Class 2 - Residential
Approvals typically in ~35 days

Class 1 & 2 - Residential
CDCs typically in ~14 days

Class 10b - Residential
CDCs typically in ~5 days
Yes, if your site and design qualify for CDC. A CDC can avoid the full DA process, but NSW Planning Portal, notification and other approvals may still apply.
A CDC combines planning and construction approval for eligible work. A CC is construction approval issued after a DA has already been approved.
We typically issue single-dwelling CDCs within 10-14 business days after receiving complete and compliant documents. Timing depends on site constraints, notifications and further information.
BASIX is a NSW sustainability certificate covering water, energy and thermal performance. You generally need it for new residential development.
Usually, yes. A soil or geotechnical report helps the engineer design suitable footings for the site.