Your renovation. Approved before the first wall moves.

Renovation CDC - no DA, no council queue. We take 10–14 days.

"We started our renovation without realising a structural alteration needed a CC. Council issued a stop work order. No1 resolved the compliance pathway and got us back on site in 4 days."

In NSW, any structural renovation, extension, or addition requires either a CDC or CC before work begins - and an Occupation Certificate when it is complete.

  • Structural extension CDC reviewed to NCC Volume Two compliance
  • Internal alterations assessed for BCA Part F (health and amenity) compliance
  • Waterproofing and termite management included in stage inspection scope

Eligibility Check

Does your renovation qualify for a CDC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • Located in New South Wales
  • Extension does not exceed 50% of the original building floor area (for CDC)
  • Extension height does not exceed 8.5m
  • Setbacks of the extension comply with SEPP Housing 2021
  • Not in a heritage conservation area
  • Work is structural - not purely cosmetic

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

Renovation certification.
From plans to first pour.

Typical renovation CDC issued in 10–14 business days.

  1. Day 1

    Submit Plans

    Upload architectural drawings, structural engineering, and BASIX (if required).

  2. Days 1–5

    BCA Compliance Review

    Structural, fire, waterproofing, and energy compliance checked for the extension.

  3. Days 5–10

    Conditions Issued

    Any conditions communicated directly with your architect - no council delay.

  4. Day 10–14

    CDC or CC Issued

    Certificate signed. Your builder can begin immediately.

  5. During Build

    Frame & Waterproofing

    We attend frame stage and wet area waterproofing inspections on one schedule.

  6. Completion

    Occupation Certificate

    Final sign-off. Extension legally habitable from the day we issue the OC.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Residential Certification Services

Expert guidance and fast approvals to get your residential project out of the ground sooner.

Complying Development (CDC)

Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Perfect for new homes, duplexes & granny flats
Approval typically in 10–15 business days
We handle all government portal lodgements
Free initial eligibility consultation
Independent expert assessmentGet a quote
Complying Development (CDC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Drawings

Showing existing and proposed works - from your architect or draftsperson

Site / Survey Plan

Current survey showing all boundary setbacks

Structural Engineering

For any new structural members, footings, or beams

BASIX Certificate

Required for additions over 50sqm - check with your architect

Waterproofing Spec

For wet areas (bathrooms, laundry) in the new work

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern Beaches & North ShoreEastern SuburbsSt George & Sutherland ShireNewcastle & The Lower Hunter
Loading coverage map...

Unrestricted Authority

Our Certification Capabilities

Recent Renovations & Extensions we've certified

High-rise residential tower certification capabilities

Class 2 - Residential

High-Rise Residential Towers

Approvals typically in ~35 days

Custom home Complying Development Certificate capabilities

Class 1 & 2 - Residential

Custom Luxury Homes & Duplexes

CDCs typically in ~14 days

Residential swimming pool compliance capabilities

Class 10b - Residential

Swimming Pools & Minor Structures

CDCs typically in ~5 days

Renovation certification - your questions answered.

Not always. Cosmetic work usually does not need approval, but structural renovations or extensions may need a CDC or DA/CC depending on the site and design.

Structural work such as extensions, new rooms, storey additions, enclosing areas or removing load-bearing walls may need a CDC or DA/CC before work starts.

We typically issue renovation CDCs within 10-14 business days after receiving complete and compliant documents. Timing depends on site constraints and further information.

Cosmetic upgrades may not need certification, but structural changes, new wet areas, waterproofing changes or plumbing relocation may require approval and relevant trade certification.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.