
Class 2 - Residential
High-Rise Residential Towers
Approvals typically in ~35 days
"Our townhouse DA spent 11 months in council assessment - and came back with 22 conditions. No1 told us upfront which conditions would apply and planned around them."
Multi-dwelling developments must satisfy fire engineering, BCA Section C, shared driveway design, and individual BASIX compliance for every lot - all before a single slab is poured.
Eligibility Check
Select all that apply to your project.
You missed a few requirements.
Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:
Don't worry, we've got you.
Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.
Call 0421 936 489Typical 4–8 dwelling development certified in 20–30 business days.
Day 1
Full architectural set plus structural, hydraulic, and fire engineering reports.
Days 1–10
Volume One compliance, fire separation, egress, and shared infrastructure checked.
Days 10–20
Any conditions resolved directly with your design team - no council queue.
Day 20–30
Certificate covers all dwellings. Builders mobilise on the full site.
During Build
All critical inspection stages managed by our team across the full development.
Completion
OCs issued per-lot as dwellings complete - enabling staged settlement.
Have a question about the process? Call us - we're happy to walk you through it.
Scope of Works
Expert guidance and fast approvals to get your residential project out of the ground sooner.
Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Architectural Drawings (all lots)
Floor plans, elevations, sections, fire wall details
Site / Survey Plan
Showing all lot boundaries, shared driveways and common areas
BASIX Certificates (per dwelling)
Individual energy certificate for each dwelling
Structural Engineering Report
Including shared footings and retaining walls
Fire Engineering Report
For attached dwellings under NCC Volume One
Hydraulic / Drainage Plan
Shared stormwater management design
Landscape Plan
Showing private open space compliance per lot
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Townhouses & Multi-Dwelling we've certified

Class 2 - Residential
Approvals typically in ~35 days

Class 1 & 2 - Residential
CDCs typically in ~14 days

Class 10b - Residential
CDCs typically in ~5 days
Yes, if the land and design meet the applicable complying development standards. Eligibility depends on zoning, lot size, layout, access, site constraints and NCC requirements.
For staged projects, an Occupation Certificate may be issued for an eligible completed dwelling or part, if statutory requirements are satisfied. Avoid using 'interim OC'.
Attached Class 1a dwellings require compliant fire separation under the applicable NCC requirements. The submitted wall system and construction details must be reviewed before certificate issue.
No. One appointed Principal Certifier can manage the approved development, inspections and OC process, subject to the approval structure and statutory requirements.
Get in touch
We'll review your project details and get back to you within 24 hours.

Unrestricted certifiers
Your project is reviewed directly by NSW-accredited certifiers - no middlemen.