Two dwellings. One certifier. One timeline.

Dual occupancy CDC - faster than a single DA. We take 14–20 days.

"Our duplex DA sat with council for 14 months before we found out we qualified for CDC. No1 issued our CDC in 18 days. We had lost over a year for nothing."

A duplex on the right lot can be CDC-approved in NSW without council - but fire separation, acoustic compliance, and party wall design must all satisfy the NCC before we can sign off.

  • Party wall fire separation reviewed to NCC Specification 9 in a single assessment
  • Acoustic compliance to AS 3671 checked before certificate issue
  • Both dwellings covered by one CDC - one fee, one timeline

Eligibility Check

Does your duplex block qualify for a fast CDC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • Located in New South Wales
  • Lot size over 600sqm (SEPP Housing 2021 dual occupancy provisions)
  • Lot is not in a heritage conservation area
  • Both dwellings have separate vehicular access
  • Building height under 8.5m
  • Not in a flood-prone or high-hazard bush-fire zone

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

Duplex certification.
Both units, one process.

Typical duplex CDC issued in 14–20 business days.

  1. Day 1

    Submit Plans

    Architectural drawings, site plan, BASIX certificates (one per dwelling), and engineering.

  2. Days 1–7

    BCA & Fire Review

    Party wall fire separation, NCC Volume One compliance, and acoustic report checked.

  3. Days 7–14

    Conditions Resolved

    Any conditions addressed directly with you - no council intermediary.

  4. Day 14–20

    CDC Issued

    Certificate covers both dwellings. Builders can mobilise on both simultaneously.

  5. During Build

    Stage Inspections

    Pre-slab, frame (including party wall), waterproofing, and insulation on one schedule.

  6. Completion

    Occupation Certificate

    Final inspection of both dwellings. OC issued for each. Legal occupancy begins.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Residential Certification Services

Expert guidance and fast approvals to get your residential project out of the ground sooner.

Complying Development (CDC)

Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Perfect for new homes, duplexes & granny flats
Approval typically in 10–15 business days
We handle all government portal lodgements
Free initial eligibility consultation
Independent expert assessmentGet a quote
Complying Development (CDC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Drawings (both units)

Floor plans, elevations, sections, party wall details

Site / Survey Plan

From your licensed surveyor

BASIX Certificate (Ã-2)

One per dwelling - mandatory for all NSW homes

Structural Engineering Report

Including party wall and footing design

Acoustic Report

Party wall acoustic compliance to AS 3671

Hydraulic / Drainage Plan

Separate drainage for each dwelling

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern Beaches & North ShoreEastern SuburbsSt George & Sutherland ShireNewcastle & The Lower Hunter
Loading coverage map...

Unrestricted Authority

Our Certification Capabilities

Recent Duplexes & Dual Occupancy we've certified

High-rise residential tower certification capabilities

Class 2 - Residential

High-Rise Residential Towers

Approvals typically in ~35 days

Custom home Complying Development Certificate capabilities

Class 1 & 2 - Residential

Custom Luxury Homes & Duplexes

CDCs typically in ~14 days

Residential swimming pool compliance capabilities

Class 10b - Residential

Swimming Pools & Minor Structures

CDCs typically in ~5 days

Duplex certification - your questions answered.

Yes, if the land and design qualify for CDC. A CDC can avoid the full DA process, but portal, notification and other approvals may still apply.

It depends on the local planning controls. If no LEP minimum applies, the complying development code may apply a 600m2 minimum.

Yes. A duplex generally requires compliant fire separation between the two Class 1a dwellings under the applicable NCC requirements.

BASIX documentation must cover both dwellings and match the submitted plans. It may not always be one separate certificate per dwelling.

We typically aim to issue eligible duplex CDCs within 14-20 business days after receiving complete and compliant documents. A DA is usually slower.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.