Class 2 - Residential
High-Rise Residential Towers
Approvals typically in ~35 days
"Our duplex DA sat with council for 14 months before we found out we qualified for CDC. No1 issued our CDC in 18 days. We had lost over a year for nothing."
A duplex on the right lot can be CDC-approved in NSW without council - but fire separation, acoustic compliance, and party wall design must all satisfy the NCC before we can sign off.
Eligibility Check
Select all that apply to your project.
You missed a few requirements.
Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:
Don't worry, we've got you.
Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.
Call 0421 936 489Typical duplex CDC issued in 14–20 business days.
Day 1
Architectural drawings, site plan, BASIX certificates (one per dwelling), and engineering.
Days 1–7
Party wall fire separation, NCC Volume One compliance, and acoustic report checked.
Days 7–14
Any conditions addressed directly with you - no council intermediary.
Day 14–20
Certificate covers both dwellings. Builders can mobilise on both simultaneously.
During Build
Pre-slab, frame (including party wall), waterproofing, and insulation on one schedule.
Completion
Final inspection of both dwellings. OC issued for each. Legal occupancy begins.
Have a question about the process? Call us - we're happy to walk you through it.
Scope of Works
Expert guidance and fast approvals to get your residential project out of the ground sooner.
Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Architectural Drawings (both units)
Floor plans, elevations, sections, party wall details
Site / Survey Plan
From your licensed surveyor
BASIX Certificate (Ã-2)
One per dwelling - mandatory for all NSW homes
Structural Engineering Report
Including party wall and footing design
Acoustic Report
Party wall acoustic compliance to AS 3671
Hydraulic / Drainage Plan
Separate drainage for each dwelling
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Duplexes & Dual Occupancy we've certified

Class 2 - Residential
Approvals typically in ~35 days

Class 1 & 2 - Residential
CDCs typically in ~14 days

Class 10b - Residential
CDCs typically in ~5 days
Yes, if the land and design qualify for CDC. A CDC can avoid the full DA process, but portal, notification and other approvals may still apply.
It depends on the local planning controls. If no LEP minimum applies, the complying development code may apply a 600m2 minimum.
Yes. A duplex generally requires compliant fire separation between the two Class 1a dwellings under the applicable NCC requirements.
BASIX documentation must cover both dwellings and match the submitted plans. It may not always be one separate certificate per dwelling.
We typically aim to issue eligible duplex CDCs within 14-20 business days after receiving complete and compliant documents. A DA is usually slower.