Class 2 - Residential
High-Rise Residential Towers
Approvals typically in ~35 days
"Our previous certifier went off the job halfway through. We could not get our OC and the bank would not release final funds. No1 stepped in, reviewed the file, and issued our OC within the week."
A Construction Certificate confirms your construction drawings comply with the NCC. An Occupation Certificate confirms the completed building is safe for occupation. Both are legally required - neither can be skipped.
CC typically issued within 7–10 business days of receiving complete documentation.
Day 1
DA consent, construction drawings, BASIX, and all engineering reports submitted.
Days 1–7
We confirm NCC compliance - structure, energy, fire, and accessibility.
Day 7–10
CC issued. Construction can legally begin immediately.
During Build
All critical stages inspected - pre-slab, frame, waterproofing, insulation, final.
Completion
Final on-site inspection confirms compliance. OC issued. Legal occupation begins.
Have a question about the process? Call us - we're happy to walk you through it.
Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Development Consent (DA)
Approved DA from council including all conditions
Construction Drawings
Full architectural set showing all proposed works
BASIX Certificate
Current BASIX consistent with the approved DA
Structural Engineering
Certified by a practising engineer
Hydraulic Plan
Stormwater and sewer connection design
Fire Safety Report
For Class 2–9 buildings under NCC Volume One
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Construction Certificates we've certified

Class 2 - Residential
Approvals typically in ~35 days

Class 7b & 8 - Industrial
Approvals typically in ~20 days

Class 1 & 2 - Residential
CDCs typically in ~14 days

Class 5 & 6 - Commercial
CDCs typically in ~10 days

Class 10b - Residential
CDCs typically in ~5 days
A CC confirms that construction drawings and specifications are consistent with the DA consent and relevant NCC requirements. It is required before building work starts.
An OC allows occupation or use of a building, or part of a building, after the Principal Certifier is satisfied statutory requirements have been met.
No. A CDC combines planning and construction approval. A CC is generally required when the project has DA approval.
Avoid 'Interim OC'. For staged projects, an Occupation Certificate may be issued for an eligible completed part if statutory requirements are satisfied.