Granny Flat CDC Sydney | Secondary Dwelling Approvals

Granny flat CDC - no DA, no council, no 12-month wait.

"We were quoted 4 months for council DA approval on our granny flat. We could not wait. No1 issued the CDC in 14 days. Our tenants moved in the same month."

Under SEPP Housing 2021, most NSW lots over 450sqm can have a secondary dwelling (granny flat) up to 60sqm approved via private CDC - without any council DA process.

  • Secondary dwelling CDC issued under SEPP Housing 2021 - no DA required
  • Maximum 60sqm floor area - confirmed against your design before submission
  • Separate entrance, bathroom, and kitchen comply with NCC Volume Two

Eligibility Check

Does your backyard qualify for a granny flat CDC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • Located in New South Wales
  • Lot size between 450sqm and 900sqm (SEPP Housing 2021 provisions)
  • Granny flat is under 60sqm total floor area
  • Only one secondary dwelling on the lot
  • Not in a heritage conservation area
  • Proposed setbacks comply with SEPP Housing 2021

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

Granny flat.
From approval to rental income.

Secondary dwelling CDC typically issued in 10–14 business days.

  1. Day 1

    Submit Plans

    Upload architectural drawings, site plan, and BASIX certificate.

  2. Days 1–5

    SEPP & BCA Review

    We confirm 60sqm floor area, setbacks, BASIX, and NCC compliance.

  3. Days 5–10

    Conditions Resolved

    Any minor issues addressed directly - no council intermediary.

  4. Day 10–14

    CDC Issued

    Certificate signed. Your builder can begin construction immediately.

  5. During Build

    Stage Inspections

    Pre-slab, frame, waterproofing - all managed on one schedule.

  6. Completion

    Occupation Certificate

    Final inspection. OC issued. You can legally rent out the dwelling.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Residential Certification Services

Expert guidance and fast approvals to get your residential project out of the ground sooner.

Complying Development (CDC)

Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Perfect for new homes, duplexes & granny flats
Approval typically in 10–15 business days
We handle all government portal lodgements
Free initial eligibility consultation
Independent expert assessmentGet a quote
Complying Development (CDC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Drawings

Floor plan, elevations, sections - from your architect or draftsperson

Site / Survey Plan

Showing the existing home and the proposed granny flat location

BASIX Certificate

Mandatory energy efficiency certificate for all NSW dwellings

Structural Engineering

For footing and slab design

Hydraulic / Drainage Plan

Connection to existing drainage infrastructure

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

Greater SydneyParramattaBlacktownPenrithLiverpoolCastle Hill
Loading coverage map...

Unrestricted Authority

Our Certification Capabilities

Recent Secondary Dwellings we've certified

High-rise residential tower certification capabilities

Class 2 - Residential

High-Rise Residential Towers

Approvals typically in ~35 days

Custom home Complying Development Certificate capabilities

Class 1 & 2 - Residential

Custom Luxury Homes & Duplexes

CDCs typically in ~14 days

Residential swimming pool compliance capabilities

Class 10b - Residential

Swimming Pools & Minor Structures

CDCs typically in ~5 days

Granny flat certification - your questions answered.

Not always. Many granny flats may qualify for CDC instead of a council DA if the site and design meet the applicable standards.

A secondary dwelling is generally limited to 60m2 gross floor area, subject to the applicable planning controls and site requirements.

Yes, once the required approval and Occupation Certificate are in place, subject to the approval conditions and tenancy requirements.

A 450m2 minimum lot size commonly applies for CDC secondary dwellings, but eligibility must be checked against the site and planning controls.

We typically issue secondary-dwelling CDCs within 10-14 business days after receiving complete and compliant documents.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.