Class 2 - Residential
High-Rise Residential Towers
Approvals typically in ~35 days
"We were quoted 4 months for council DA approval on our granny flat. We could not wait. No1 issued the CDC in 14 days. Our tenants moved in the same month."
Under SEPP Housing 2021, most NSW lots over 450sqm can have a secondary dwelling (granny flat) up to 60sqm approved via private CDC - without any council DA process.
Eligibility Check
Select all that apply to your project.
You missed a few requirements.
Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:
Don't worry, we've got you.
Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.
Call 0421 936 489Secondary dwelling CDC typically issued in 10–14 business days.
Day 1
Upload architectural drawings, site plan, and BASIX certificate.
Days 1–5
We confirm 60sqm floor area, setbacks, BASIX, and NCC compliance.
Days 5–10
Any minor issues addressed directly - no council intermediary.
Day 10–14
Certificate signed. Your builder can begin construction immediately.
During Build
Pre-slab, frame, waterproofing - all managed on one schedule.
Completion
Final inspection. OC issued. You can legally rent out the dwelling.
Have a question about the process? Call us - we're happy to walk you through it.
Scope of Works
Expert guidance and fast approvals to get your residential project out of the ground sooner.
Bypass council DA delays. We assess and approve Complying Development Certificates rapidly.

Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Architectural Drawings
Floor plan, elevations, sections - from your architect or draftsperson
Site / Survey Plan
Showing the existing home and the proposed granny flat location
BASIX Certificate
Mandatory energy efficiency certificate for all NSW dwellings
Structural Engineering
For footing and slab design
Hydraulic / Drainage Plan
Connection to existing drainage infrastructure
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Secondary Dwellings we've certified

Class 2 - Residential
Approvals typically in ~35 days

Class 1 & 2 - Residential
CDCs typically in ~14 days

Class 10b - Residential
CDCs typically in ~5 days
Not always. Many granny flats may qualify for CDC instead of a council DA if the site and design meet the applicable standards.
A secondary dwelling is generally limited to 60m2 gross floor area, subject to the applicable planning controls and site requirements.
Yes, once the required approval and Occupation Certificate are in place, subject to the approval conditions and tenancy requirements.
A 450m2 minimum lot size commonly applies for CDC secondary dwellings, but eligibility must be checked against the site and planning controls.
We typically issue secondary-dwelling CDCs within 10-14 business days after receiving complete and compliant documents.