Don't Inherit Someone Else's Certification Uncertainty.

A Complying Development Certificate (CDC) lets you bypass council delays, with approval typically in 10–15 business days. No.1 Building Services manages the entire process through to your Occupation Certificate.

Building certifier reviewing plans

"Council DA approvals can take 85+ days. A private CDC is typically issued in 10–15 business days, helping you build sooner."

Every service you need, at every stage.
Your Path to Approval.

From planning a build to handing over the keys, we support home owners at every point in the property journey.

  1. Before You Build

    Secure Your Approval

    We confirm CDC eligibility and lodge your application via the NSW Planning Portal, managing all government referrals.

  2. While You Build

    Maintain Full Compliance

    Our licensed inspectors verify compliance at every critical stage. Inspection reports are issued the same day with no surprises.

  3. After You Build

    Move In Legally

    We conduct the final inspection and issue your Occupation Certificate, ensuring your dwelling is safe and lawful to occupy.

Have a question about the process? Call us - we're happy to walk you through it.

What actually happens, and what you need to do

Your effort is minimal. Ours is total.

SHARE YOUR PROJECT

You:

Call us for a 10-minute consultation, or email your plans or builder's brochure.

We:

Conduct a CDC eligibility assessment, confirm your approval pathway, and provide an itemised fixed-fee quote with a document checklist.

Process step

WE ASSESS AND ADVISE

You:

Provide the documents on your checklist — typically architectural plans, engineering details, and a BASIX certificate.

We:

Complete a full technical assessment against the NCC and SEPP codes. Advise on any design amendments required before lodgement.

Process step

WE LODGE AND MANAGE

You:

Nothing. Focus on your build.

We:

Lodge all applications, manage all government agency referrals (Sydney Water, bushfire, flooding), and respond to any information requests.

Process step

APPROVED. YOU BUILD.

You:

CDC pathway: commence after the CDC and all pre-commencement requirements are satisfied. DA pathway: obtain development consent, then a Construction Certificate and satisfy pre-commencement requirements.

We:

Attend all mandatory stage inspections. Issue your Occupation Certificate upon satisfactory final inspection.

Process step

Ready to partner with No1?

Get a fast-tracked quote from a licensed NSW certifier. We're ready to review your next project.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Plans

Full set of drawings including floor plans, elevations, sections, and site plan

Structural Engineering Plans

Engineered foundation, floor, and framing details from a registered structural engineer

Applicable BASIX or Sustainability

For relevant residential development, consistent with the submitted plans

Section 10.7 Planning Certificate

Zoning and planning controls for your land

Sydney Water Building Plan Approval

Confirmation of sewer and water asset clearances

Survey / Site Plan

Registered survey showing property dimensions, easements, and boundary setbacks

Missing something? Don't worry — we can help source it.

Start your application

Unrestricted Authority

Our Certification Capabilities

Projects we have certified.

High-rise residential tower certification capabilities

Class 2 - Residential

High-Rise Residential Towers

Approvals typically in ~35 days

Industrial warehouse private building certification

Class 7b & 8 - Industrial

Industrial Warehousing & Logistics

Approvals typically in ~20 days

Roof structure inspection audit

Specialist Building Inspection

Roof Framing & Structural Defect Audit

50+ page report in 24 hours

Subfloor moisture inspection

Water Leak & Damp Inspection

Subfloor Moisture & Water Ingress Detection

Non-destructive thermal scanning

Masonry crack dilapidation inspection

Dilapidation & Structural Audit

Masonry Cracking & Settlement Assessment

Legal third-party sign-off

Custom home Complying Development Certificate capabilities

Class 1 & 2 - Residential

Custom Luxury Homes & Duplexes

CDCs typically in ~14 days

Medical centre fitout private CDC capabilities

Class 5 & 6 - Commercial

Medical Centres & Commercial Fitouts

CDCs typically in ~10 days

Residential swimming pool compliance capabilities

Class 10b - Residential

Swimming Pools & Minor Structures

CDCs typically in ~5 days

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern Beaches & North ShoreEastern SuburbsSt George & Sutherland ShireNewcastle & The Lower Hunter
Loading coverage map...

Frequently Asked Questions

Most standard residential projects in NSW qualify - including new homes, duplexes, granny flats, extensions, garages, decks, and swimming pools. Eligibility depends on zoning, lot size, and any site-specific overlays such as bushfire prone land, flood-affected land, or heritage items. Contact us for a free eligibility assessment.

For most residential CDCs, you will need architectural plans, a structural engineering report, a BASIX certificate, a Section 10.7 planning certificate, and a Sydney Water building plan approval. We send you a precise, itemised checklist following your initial enquiry so there is no guesswork.

Our fees vary depending on the project type, size, and complexity — we don't publish fixed prices because no two projects are the same. Call us on 0421 936 489 or submit the quote form for a free, no-obligation quote tailored to your project.

A Development Application (DA) is lodged with your local council and assessed under council-specific rules. The average determination time across NSW is 60 to 120 days. A Complying Development Certificate (CDC) is assessed by an accredited private certifier against state-wide SEPP codes, bypassing council entirely and typically completing in 10 to 15 business days.

We will advise you clearly and honestly - including if your project requires a DA. Where a DA is necessary, we can refer you to a trusted town planner and subsequently issue the Construction Certificate once DA consent is granted.

At each mandatory critical stage inspection — footings/excavation, slab, frame, wet area waterproofing, insulation, and final — the Principal Certifier arranges required inspections and assesses relevant work and documentation against the approval and applicable statutory requirements. Certifiers do not supervise trades or manage construction work. For a CDC, the mandatory inspection stages are set out in the Environmental Planning and Assessment Regulation 2021. A detailed written inspection report, including photographs, is issued on the same day as each inspection. If a compliance issue is identified, we advise you and your builder on the same day with a clear rectification pathway — We provide written inspection outcomes and identify the required compliance response.

No. You may engage us with nothing more than a concept or a builder's sketch. We can advise you on what plans are required and refer you to a qualified building designer if needed.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.