Your store. Certified before your first trading day.

Retail fitout CC issued in 7–14 days. Trade from day one.

"Our shopfront fit-out was complete but we could not open because the CC had never been lodged by the builder. No1 issued a retrospective approval pathway and we opened within 2 weeks."

A retail fitout or new shopfront must have a Construction Certificate before work begins and an Occupation Certificate before trading. No CC = no legal occupation = potential lease forfeiture.

  • BCA Section D occupant load and egress compliance reviewed per tenancy
  • Shopfront signage and external works assessed for heritage and planning overlay compliance
  • Fire safety schedule issued with the OC for ongoing annual compliance

Eligibility Check

Does your retail fitout need a CC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • The fitout changes internal walls, counters that affect egress, or ceiling height
  • Work involves new or relocated fire detection or sprinkler systems
  • The tenancy is Class 6 (shop, restaurant, café, service station)
  • Not a purely cosmetic refresh (paint, signage, product display)
  • No change in building class is proposed

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

Retail certification.
Open by your target date.

Typical retail CC issued in 7–14 business days from complete documentation.

  1. Day 1

    Submit Fitout Drawings

    Architectural fitout plans, services, signage, and access compliance report.

  2. Days 1–7

    BCA & Access Review

    Occupant load, egress, fire compliance, and AS 1428 access confirmed.

  3. Days 7–12

    Conditions Addressed

    Any conditions resolved with your fitout contractor directly.

  4. Day 12–14

    CC Issued

    Certificate signed. Fitout construction legally commences.

  5. During Build

    Stage Inspections

    Ceiling, services, and fire systems inspected during construction.

  6. Completion

    OC & Fire Safety Schedule

    Final inspection. OC issued. Fire safety schedule registered. Trading commences.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Unrestricted Certification Services

Comprehensive Class 2–9 building certification and compliance auditing tailored for commercial and industrial developments.

Construction Certificates (CC)

Full NCC/BCA assessment and issuance of Construction Certificates for DA-approved commercial builds.

Comprehensive BCA/NCC compliance reviews
Fire engineering & acoustic report integration
Accessibility (DDA) compliance verification
Fast-tracked assessment for tight construction schedules
Independent expert assessmentGet a quote
Construction Certificates (CC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Fitout Drawings

Floor plan, sections, signage - from your fitout architect or draftsperson

Fire Services Layout

Sprinkler and detection modifications if applicable

Access Report

AS 1428 access compliance for customer-facing retail

Hydraulic Plan

For cafes and restaurants - grease trap and drainage

Services Drawing

Mechanical, electrical, and gas services layout

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern Beaches & North ShoreEastern SuburbsSt George & Sutherland ShireNewcastle & The Lower Hunter
Loading coverage map...

Unrestricted Authority

Our Certification Capabilities

Recent Retail & Shopfronts we've certified

Industrial warehouse private building certification

Class 7b & 8 - Industrial

Industrial Warehousing & Logistics

Approvals typically in ~20 days

Medical centre fitout private CDC capabilities

Class 5 & 6 - Commercial

Medical Centres & Commercial Fitouts

CDCs typically in ~10 days

Retail & Shopfronts FAQs

Yes, if the fitout involves building work, structural changes, altered egress, fire-safety changes, accessibility changes or services modifications. Some fitouts may qualify for CDC instead.

A fire safety schedule lists the essential fire safety measures required for the building or tenancy, such as sprinklers, detection systems, exit signs and fire doors.

No. If an OC is required, the tenancy should not be occupied or used for trading until the OC is issued.

We typically aim to issue retail fitout CCs within 7-14 business days after receiving complete and compliant documents.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.