Approvals typically in ~20 days
"Our shopfront fit-out was complete but we could not open because the CC had never been lodged by the builder. No1 issued a retrospective approval pathway and we opened within 2 weeks."
A retail fitout or new shopfront must have a Construction Certificate before work begins and an Occupation Certificate before trading. No CC = no legal occupation = potential lease forfeiture.
Eligibility Check
Select all that apply to your project.
You missed a few requirements.
Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:
Don't worry, we've got you.
Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.
Call 0421 936 489Typical retail CC issued in 7–14 business days from complete documentation.
Day 1
Architectural fitout plans, services, signage, and access compliance report.
Days 1–7
Occupant load, egress, fire compliance, and AS 1428 access confirmed.
Days 7–12
Any conditions resolved with your fitout contractor directly.
Day 12–14
Certificate signed. Fitout construction legally commences.
During Build
Ceiling, services, and fire systems inspected during construction.
Completion
Final inspection. OC issued. Fire safety schedule registered. Trading commences.
Have a question about the process? Call us - we're happy to walk you through it.
Scope of Works
Comprehensive Class 2–9 building certification and compliance auditing tailored for commercial and industrial developments.
Full NCC/BCA assessment and issuance of Construction Certificates for DA-approved commercial builds.

Ready to get started?
Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.
See the exact documents needed. No guesswork, no endless lists.
Architectural Fitout Drawings
Floor plan, sections, signage - from your fitout architect or draftsperson
Fire Services Layout
Sprinkler and detection modifications if applicable
Access Report
AS 1428 access compliance for customer-facing retail
Hydraulic Plan
For cafes and restaurants - grease trap and drainage
Services Drawing
Mechanical, electrical, and gas services layout
Missing something? Don't worry — we can help source it.
Start your applicationNo.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.
Unrestricted Authority
Recent Retail & Shopfronts we've certified

Class 7b & 8 - Industrial
Approvals typically in ~20 days

Class 5 & 6 - Commercial
CDCs typically in ~10 days
Yes, if the fitout involves building work, structural changes, altered egress, fire-safety changes, accessibility changes or services modifications. Some fitouts may qualify for CDC instead.
A fire safety schedule lists the essential fire safety measures required for the building or tenancy, such as sprinklers, detection systems, exit signs and fire doors.
No. If an OC is required, the tenancy should not be occupied or used for trading until the OC is issued.
We typically aim to issue retail fitout CCs within 7-14 business days after receiving complete and compliant documents.
Get in touch
We'll review your project details and get back to you within 24 hours.

Unrestricted certifiers
Your project is reviewed directly by NSW-accredited certifiers - no middlemen.