DA approved. Start building with your CC in hand.

Commercial CC issued in 7–14 business days. NCC & BCA compliance confirmed before ground breaks.

"Our DA was approved but our original certifier couldn't issue the CC for three weeks. Every day of delay was costing us in holding costs and subcontractor rescheduling. No1 Building Services assessed our documentation in 48 hours and issued the CC in 8 business days, getting our project back on schedule."

A Construction Certificate (CC) is the mandatory approval confirming that your detailed construction drawings and specifications comply with the National Construction Code (NCC), Building Code of Australia (BCA), and the conditions of your Development Consent. No commercial construction work can legally commence without a valid CC.

  • Required after DA approval, before any construction begins
  • Confirms structural, fire safety, accessibility, and energy compliance
  • Issued by your appointed Principal Certifier
  • Lodged and managed via the NSW Planning Portal

Commercial CC.
From DA to breaking ground.

Commercial CCs typically issued within 7–14 business days of receiving a complete documentation package.

  1. Day 1

    PC Appointment

    You appoint No1 Building Services as Principal Certifier via the NSW Planning Portal — formally engaging us to manage your CC and all mandatory inspections.

  2. Days 1–7

    Documentation Review

    Our team reviews construction drawings, engineer reports, and specifications for full NCC and BCA compliance, identifying any issues early.

  3. Days 5–12

    Compliance Sign-Off

    Any minor compliance items are resolved with your design team. All supporting documentation is confirmed complete.

  4. Days 7–14

    CC Issued

    Your Construction Certificate is issued and lodged on the NSW Planning Portal — construction can legally commence.

Have a question about the process? Call us - we're happy to walk you through it.

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Development Consent (DA)

Approved DA and stamped plans from Council.

BCA Compliance Report

Detailing compliance with BCA Class 2–9 requirements.

Access / Mobility Report

AS 1428 compliance report.

Fire Engineering Design

If required by the building's fire safety strategy.

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

South West SydneyGreater Western & North West SydneyCity & Inner WestParramatta & Central WestNorthern Beaches & North ShoreEastern SuburbsSt George & Sutherland ShireNewcastle & The Lower Hunter
Loading coverage map...

Commercial CC FAQs

A CC is required before starting DA-approved commercial building work. If the work is approved by CDC, a separate CC is generally not required.

A Principal Certifier is appointed to carry out statutory certification functions, required inspections and OC assessment. Certification must be carried out by an appropriately registered certifier.

No. For DA-approved commercial building work, construction should not start until the CC is issued, the PC is appointed, required notices are given and pre-commencement conditions are satisfied.

We typically aim for 7-14 business days after receiving complete and compliant documents. Timing depends on project complexity, reports, referrals and further information.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.