Commercial Building Certification Sydney

Bypass council delays. Commercial office CDC in 5–20 days.

"Our retail lease started but the fitout could not open - the previous certifier had missed a BCA fire compliance requirement. No1 identified the gap, resolved it with the engineer, and we opened 11 days later."

Whether developing a new office building or performing a corporate tenancy fit-out, compliance with BCA Part D (access & egress), fire safety schedules, and mechanical ventilation is mandatory. We provide fast private certification so your project stays on schedule.

  • Complying Development Certificates (CDC) for office tenancies issued in 5–20 days
  • Construction Certificates (CC) and Occupation Certificates (OC) for new office developments
  • Access, mobility, and fire safety audits handled by our unrestricted certifiers

Eligibility Check

Does your office building or fit-out qualify for a CDC?

Select all that apply to your project.

Tick each criterion that applies to your project

Your project likely qualifies for a fast CDC.

No council. No delays.

Get your free quote

You missed a few requirements.

Based on your selection, your project might require an alternative approval pathway (like a DA). You are missing:

  • Proposed office use is permissible in the zone
  • Zonings B1-B8, IN1-IN3 or similar NSW commercial zones
  • No increase in gross floor area (for CDC fit-out pathway)
  • Complies with fire safety separation requirements under the BCA

Don't worry, we've got you.

Our experts can counsel you on alternative pathways and guide you through the process. Call us immediately for a free consultation.

Call 0421 936 489

Office fitout.
Certified before your lease starts.

Typical office fitout CC or CDC issued in 7–14 business days.

  1. Day 1

    Submit Fitout Drawings

    Upload architectural fitout plans, services layout, and access compliance report.

  2. Days 1–5

    BCA Compliance Review

    Egress, fire compartmentation, access, and services compliance checked.

  3. Days 5–10

    Conditions Issued

    Any conditions directly communicated to your fitout builder and architect.

  4. Day 10–14

    CC or CDC Issued

    Certificate issued. Fitout construction can legally commence.

  5. During Build

    Stage Inspections

    Frame, services, and fire services inspected during construction.

  6. Completion

    Occupation Certificate

    Final inspection confirms BCA compliance. OC issued. Staff can occupy legally.

Have a question about the process? Call us - we're happy to walk you through it.

Scope of Works

Unrestricted Certification Services

Comprehensive Class 2–9 building certification and compliance auditing tailored for commercial and industrial developments.

Construction Certificates (CC)

Full NCC/BCA assessment and issuance of Construction Certificates for DA-approved commercial builds.

Comprehensive BCA/NCC compliance reviews
Fire engineering & acoustic report integration
Accessibility (DDA) compliance verification
Fast-tracked assessment for tight construction schedules
Independent expert assessmentGet a quote
Construction Certificates (CC)

Ready to get started?

Get a fast-tracked quote from a licensed NSW certifier. Most clients hear back within 2 hours.

Request a Quote

Select your project type

See the exact documents needed. No guesswork, no endless lists.

Architectural Fitout Drawings

Floor plan, reflected ceiling plan, sections - from your fitout architect

Services Layout

Mechanical (HVAC), electrical, and plumbing distribution

Access Report (AS 1428)

Confirming compliant access for people with disabilities

Fire Services Design

Sprinkler and detection layout if services are modified

Egress Analysis

Confirming travel distances and exit widths comply with BCA Section D

Missing something? Don't worry — we can help source it.

Start your application

Where We Provide This Service

No.1 Building Services provides fast, unrestricted certification across the following regions. Explore our interactive coverage map.

Greater SydneySydney CBDParramattaMacquarie ParkNorth Sydney
Loading coverage map...

Office Buildings & Fit-outs FAQs

Yes, if the fitout involves building work such as structural changes, altered egress, fire-safety changes, accessibility changes or services modifications. Some works may qualify for CDC instead.

Minor cosmetic works may not need certification. Work affecting walls, ceilings, fire systems, access, structure or services should be checked before starting.

An access report assesses whether the fitout meets applicable NCC accessibility requirements and relevant AS 1428 provisions.

We typically aim to issue office fitout CCs within 7-14 business days after receiving complete and compliant drawings and supporting reports.

Get in touch

Request a quote

We'll review your project details and get back to you within 24 hours.

Building certifier inspecting blueprints

Unrestricted certifiers

Your project is reviewed directly by NSW-accredited certifiers - no middlemen.